We were initially appointed to prepare the outline design and planning package. Student Castle elected to manage the construction themselves and we were engaged to prepare the detailed design drawings with an ongoing role to inspect the installation and to witness the commissioning. The M & E contract value was £8,200,000.
Comments are closed