Working closely with the modular construction Premier Modular, we developed the design from concept through to working drawings for SSE the installation contractor. The scheme comprises over 800 modules and when the overall design was completed MDA produced “6 elevation” drawings for each module to facilitate the first fix M & E installation as the modules based through the factory.
Comments are closed